WestWorld Equidome Arena Ramp & Bridge

0 slides available for this slider.

Client:  City of Scottsdale
Photography:  Cooperthwaite Photography
Within the existing Equidome Arena, this project provides an accessible means to internally move from one side of the arena concourse to the other.  This new 250’ long ramp and bridge structure also accommodates the passage of emergency vehicles beneath it to gain access to the main arena floor.  No “as-built” drawings existed and no site survey was conducted to save cost.  As a result, we performed extensive on-site investigation and measurements to generate working drawings of existing conditions.  The structure was prefabricated in modular components and delivered on site for quick installation and is easily adaptable to accommodate future expansion of an elevated judges platform and specialty party suites.